Taking data out of one system and putting it into another, complete and correct, and proving it.
Or keeping two systems in step, in both directions, for as long as both are in use. We have done
this since 1989, and the harder the job, the more we want it.
MigrationGENS121
Moving from system A to system B, once, without losing anything on the way. Our data team
specialises in this work, the extract, transform and load that ETL describes, and in the
checking that proves it was done properly.
Extract
Getting the data out, including from systems with no export, no documentation and no one left who remembers how they store it.
Map
Every field in the old system matched to its place in the new one, with the gaps and the conflicts agreed with you before anything moves.
Transform
Character sets, number formats, dates, codes and structures converted, and the data cleaned and de-duplicated on the way.
Load
Into the new system through its own import routes or API where it has them, and directly where it does not.
Rehearse
Trial runs against a copy until the result is right, so the cutover itself is a repeat of something already proven.
SynchronisationGENS122
Not every migration ends with the old system switched off. Where two systems have to keep
running side by side, we write the middleware that keeps them in step, in one direction or
both.
Legacy to modern
A legacy ERP feeding a modern accounts package, so finance can move on while operations stay where they are.
Modern to legacy
A modern ERP feeding legacy accounts, where the accounts system is the one that cannot change yet.
Any to any
Any combination of system to system: ERP, accounts, CRM, ecommerce, warehouse and suppliers, with orders, stock and customers flowing both ways.
AssuranceGENS123
A migration is only finished when you can show that the data in the new system is the data
that was in the old one. Validation is part of the job, not an afterthought.
Reconcile
Record counts and control totals compared between source and destination, so nothing is missing and nothing is counted twice.
Verify
Field-level checks on the records themselves, and the relationships between them, that orders still belong to the right customers and parts to the right assemblies.
Report
Every exception listed and resolved, and a reconciliation you can sign off and keep for your auditors.
Jobs we have doneGENS124
IBM to ICL
Our first project, in 1989: EDI over X.400 between IBM and ICL systems that shared neither a protocol nor a character set, until the two could exchange orders reliably.
HP9000 to AutoCAD
Engineering drawings moved from HP9000 CAD into AutoCAD, together with the large body of metadata behind them: parts lists, cross references and the links between drawings.
Systime 500
A Systime 500 finance system moved onto one of the very first PC accounts packages.
AlphaMicro 1200
Data from AlphaMicro 1200 systems moved into Microsoft SQL Server.
ERP middleware
Live stock checks against an ERP for an ecommerce site, orders flowing both ways, tracking feeds and Salesforce connectors.
The list goes on. The story of where it started is on our about page.
The difficult onesGENS125
The migrations other people turn down are the ones we look for: proprietary formats,
fixed-width records, packed decimals, unfamiliar character sets, systems that have outlived
their manufacturer, and data whose meaning lives only in the heads of the people who use
it. We started on exactly that kind of problem, and we still enjoy it most.
How it worksGENS126
Tell us what you are moving from and to, or which systems need to talk to each other. We
look at the data, agree the mapping and the checks with you, rehearse, and then move it
or connect it, with a reconciliation at the end that shows it was done.